Actualtests pry apart PMP audit is written by the nice experts who usually are expert throughout scientific studies. PMP PMP Questions and answers plus explained inside an painless method which means you could possibly fully grasp these the right way. PMP PMP deposits plus old examinations allow you to completely ready to your true audit problems. Just about every learning resource offered by Actualtests is hand crafted by our team of exercising It all Individuals. You can be assured that your particular Actualtests Down load PMP, PMP R and A, PMP, plus PMP head deposits are definitely the highest quality, plus custom made to generate the training have the best choice you may earn throughout finding your way through your own Qualification.

2021 Jan nat-pmp:

Q11. Which of the following is a tool or technique used to verify scope?

A. Product analysis

B. Ishikawa diagram

C. Inspection

D. Requirements traceability matrix

Answer: C


Q12. Make payment to seller is done in _______ .

A. Plan Procurements

B. Conduct Procurements

C. Administer Procurements

D. Close Procurements

Answer: C


Q13. Surveys have shown that the primary skill needed to be a project manager is communication skill. The typical project manager spends approximately ______percent of his or her time communicating.

A. 40-50

B. 50-60

C. 90-95

D. 75-90

E. 60-75

Answer: D


Q14. A project manager discovers that two team members discussed what was needed to complete a work package on the project and made many changes to the project scope. The work package is now completed and the team members are planning to go on to the next work package. In looking at what was done, the project manager determines that the work does NOT meet the requirements of the project. What is the BEST course of action for the project manager?

A. Add another work package, formatted with the correct scope, to the project.

B. Refuse the submittal of the work package.

C. Have the team begin the work package again and include the incident in their performance reviews.

D. Ask the team member's manager to assign different people to the work package.

Answer: B


Q15. Your team is split between two buildings on either side of town. As a result, the team isn't very cohesive because the members don't know each other very well. The team is still in the storming stage because of the separation issues. Which of the following should you consider?

A. Training

B. Co-location

C. Corrective action

D. Conflict resolution

Answer: B


Improved pmp requirements:

Q16. According to Herzberg, which of the following is a motivational factor?

A. Working conditions

B. Achievement

C. Vacation time

D. Pay

E. Hygiene needs

Answer: B


Q17. The project budget is set at $150,000. The project duration is planned to be one year. At the completion of Week 16 of the project, the following information is collected:

Actual cost = $50,000

Plan cost = $45,000

Earned value = $40,000

What is the cost performance index?

A. 0.80

B. 0.89

C. 1.13

D. 1.25

Answer: A


Q18. What type of project structure is a hierarchically organized depiction of the resources by type?

A. Organizational Breakdown Structure (OBS)

B. Resource Breakdown Structure (RBS)

C. Work Breakdown Structure (WBS)

D. Project Breakdown Structure (PBS)

Answer: B


Q19. All of the following are tools of Perform Quality Control EXCEPT:

A. Cost of quality.

B. Inspection.

C. Control charts.

D. Flowcharting.

Answer: A


Q20. The procurement document is an input to which of the following processes?

A. Develop Project Management Plan

B. Develop Schedule

C. Identify Stakeholders

D. Determine Budget

Answer: C