★ Pass on Your First TRY ★ 100% Money Back Guarantee ★ Realistic Practice Exam Questions

Free Instant Download NEW IN101_V7 Exam Dumps (PDF & VCE):
Available on: https://www.certleader.com/IN101_V7-dumps.html


Proper study guides for Up to the immediate present BICSI BICSI Installer 1 Exam certified begins with BICSI IN101_V7 preparation products which designed to deliver the Simulation IN101_V7 questions by making you pass the IN101_V7 test at your first time. Try the free IN101_V7 demo right now.

Free demo questions for BICSI IN101_V7 Exam Dumps Below:

NEW QUESTION 1
Which of the following steps should be performed first when terminating a coaxial cable?

  • A. Verify connector type
  • B. Cut the cable
  • C. Strip the cable
  • D. Fold back the braiding

Answer: A

NEW QUESTION 2
What is the primary purpose of the telecommunications bonding infrastructure?

  • A. Equalize potentials between metallic surfaces and equipment within entrance facilities
  • B. Improve the performance of the installed telecommunications equipment
  • C. Provide backup power to the telecommunications equipment when primary power to the equipment fails.

Answer: A

NEW QUESTION 3
How much sheath of the cable needs to be removed in order to properly terminate an 8P8C?

  • A. 6.3mm (0.25")
  • B. 12.7mm (0.5")
  • C. 25mm (1")
  • D. 38 mm (1.5")

Answer: B

NEW QUESTION 4
What is the specified performance level for Category 8 cable?

  • A. 100 MHz
  • B. 250 MHz
  • C. 1000 MHz
  • D. 2000 MHz

Answer: D

NEW QUESTION 5
What is the maximum number of work areas that a CP should serve?

  • A. 2
  • B. 3
  • C. 6
  • D. 12

Answer: D

NEW QUESTION 6
Which type of tester includes a set of modular plugs?

  • A. Inductive amplifier
  • B. Tone generator
  • C. Multimeter
  • D. Cable-end locator kit

Answer: D

NEW QUESTION 7
The information transmitted by an ICT system can originate in two fundamental forms:

  • A. Synchronous and asynchronous
  • B. Light and sound
  • C. Progressive and regressive
  • D. Analog and digital

Answer: D

NEW QUESTION 8
How long does it take someone to form a first impression?

  • A. 10 to 15 seconds
  • B. 1 to 2 minutes
  • C. 5 to 10 minutes
  • D. 30 minutes to 1 hour

Answer: A

NEW QUESTION 9
Which of the following steps should be performed first when an installer is pulling optical fiber cable?

  • A. Install and secure innerduct
  • B. Ensure the cable has been tested and accepted
  • C. Label cables
  • D. Attach pull rope

Answer: B

NEW QUESTION 10
Which of the following is a building-serving space that houses large pieces of common active equipment?

  • A. TR
  • B. ER
  • C. TE
  • D. Mechanical Room
  • E. Battery room

Answer: B

NEW QUESTION 11
Which of the following should be used to install plywood in a telecommunications room if the edge of the board does NOT align with the wall studs?

  • A. Toggle bolts
  • B. Metal nails
  • C. Galvanized screws

Answer: A

NEW QUESTION 12
Which of the following types of construction protects the optical fiber by supporting each strand of glass with a buffer coating extruded over the base optical fiber's 250 um acrylate coating?

  • A. Single stranded
  • B. Loose tube
  • C. Tight buffered
  • D. Ribbon

Answer: C

NEW QUESTION 13
Light pulses in optical fiber cables are subjected to a loss in power as the light pulses travel along the optical fiber. Which of the following terms is used to describe this phenomenon?

  • A. Attenuation
  • B. Grounding
  • C. Crosstalk
  • D. Frequency

Answer: A

NEW QUESTION 14
Which phase of testing includes documenting the test results?

  • A. Phase 1
  • B. Phase 2
  • C. Phase 3

Answer: C

NEW QUESTION 15
Which of the following should be used to prevent the cable from twisting during a horizontal backbone pull?

  • A. Cable brake
  • B. Innerduct
  • C. Swivel
  • D. Wire mess grip

Answer: C

NEW QUESTION 16
......

Recommend!! Get the Full IN101_V7 dumps in VCE and PDF From Dumps-files.com, Welcome to Download: https://www.dumps-files.com/files/IN101_V7/ (New 116 Q&As Version)