NEW QUESTION 1
Which of the following steps should be performed first when terminating a coaxial cable?
- A. Verify connector type
- B. Cut the cable
- C. Strip the cable
- D. Fold back the braiding
Answer: A
NEW QUESTION 2
What is the primary purpose of the telecommunications bonding infrastructure?
- A. Equalize potentials between metallic surfaces and equipment within entrance facilities
- B. Improve the performance of the installed telecommunications equipment
- C. Provide backup power to the telecommunications equipment when primary power to the equipment fails.
Answer: A
NEW QUESTION 3
How much sheath of the cable needs to be removed in order to properly terminate an 8P8C?
- A. 6.3mm (0.25")
- B. 12.7mm (0.5")
- C. 25mm (1")
- D. 38 mm (1.5")
Answer: B
NEW QUESTION 4
What is the specified performance level for Category 8 cable?
- A. 100 MHz
- B. 250 MHz
- C. 1000 MHz
- D. 2000 MHz
Answer: D
NEW QUESTION 5
What is the maximum number of work areas that a CP should serve?
- A. 2
- B. 3
- C. 6
- D. 12
Answer: D
NEW QUESTION 6
Which type of tester includes a set of modular plugs?
- A. Inductive amplifier
- B. Tone generator
- C. Multimeter
- D. Cable-end locator kit
Answer: D
NEW QUESTION 7
The information transmitted by an ICT system can originate in two fundamental forms:
- A. Synchronous and asynchronous
- B. Light and sound
- C. Progressive and regressive
- D. Analog and digital
Answer: D
NEW QUESTION 8
How long does it take someone to form a first impression?
- A. 10 to 15 seconds
- B. 1 to 2 minutes
- C. 5 to 10 minutes
- D. 30 minutes to 1 hour
Answer: A
NEW QUESTION 9
Which of the following steps should be performed first when an installer is pulling optical fiber cable?
- A. Install and secure innerduct
- B. Ensure the cable has been tested and accepted
- C. Label cables
- D. Attach pull rope
Answer: B
NEW QUESTION 10
Which of the following is a building-serving space that houses large pieces of common active equipment?
- A. TR
- B. ER
- C. TE
- D. Mechanical Room
- E. Battery room
Answer: B
NEW QUESTION 11
Which of the following should be used to install plywood in a telecommunications room if the edge of the board does NOT align with the wall studs?
- A. Toggle bolts
- B. Metal nails
- C. Galvanized screws
Answer: A
NEW QUESTION 12
Which of the following types of construction protects the optical fiber by supporting each strand of glass with a buffer coating extruded over the base optical fiber's 250 um acrylate coating?
- A. Single stranded
- B. Loose tube
- C. Tight buffered
- D. Ribbon
Answer: C
NEW QUESTION 13
Light pulses in optical fiber cables are subjected to a loss in power as the light pulses travel along the optical fiber. Which of the following terms is used to describe this phenomenon?
- A. Attenuation
- B. Grounding
- C. Crosstalk
- D. Frequency
Answer: A
NEW QUESTION 14
Which phase of testing includes documenting the test results?
- A. Phase 1
- B. Phase 2
- C. Phase 3
Answer: C
NEW QUESTION 15
Which of the following should be used to prevent the cable from twisting during a horizontal backbone pull?
- A. Cable brake
- B. Innerduct
- C. Swivel
- D. Wire mess grip
Answer: C
NEW QUESTION 16
......
Recommend!! Get the Full IN101_V7 dumps in VCE and PDF From Dumps-files.com, Welcome to Download: https://www.dumps-files.com/files/IN101_V7/ (New 116 Q&As Version)