Q201. What are two prerequisites for installing the vCenter Server application? (Choose two.) 

A. The system vCenter Server is installed on must be a physical machine. 

B. A valid vSphere vCenter license must be obtained before installation. 

C. vCenter must be in the same network as the hosts if supporting vSphere Storage Appliance Cluster. 

D. The system vCenter Server is installed on cannot be a domain controller. 

Answer: CD 


Q202. What are two consequences of deleting a VMFS datastore from an ESXi 5.x host? (Choose two.) 

A. The datastore is unaccessible from all connected ESXi hosts. 

B. The datastore and all virtual machines are removed from the storage device. 

C. The datastore and all virtual machines remain on the storage device. 

D. The datastore is only removed from that specific ESXi host. 

Answer: AB 


Q203. Which three modules are optional components that can be added from the vCenter Server installer? (Choose three.) 

A. VMware vCenter Syslog Collector 

B. VMware vCenter License Server 

C. VMware vSphere Authentication Proxy 

D. VMware vCenter Host Update Utility 

E. VMware vSphere Auto Deploy 

Answer: ACE 


Q204. An administrator is working to update the hosts and virtual machines in a vSphere 5.x deployment using Update Manager Baselines. 

Other than host patches, which three items require a separate procedure or process to update? (Choose three.) 

A. Operating system patches 

B. Virtual Appliance updates 

C. Virtual Machine Virtual Hardware upgrades 

D. VMware Tools on machines without VMware Tools already installed 

E. Application patches within the virtual machine 

Answer: ADE 


Q205. Acme Disposal Services is a large company which has many administrators. For auditing purposes, each administrator must use a unique account to access ESXi Standard hosts. 

Which two actions satisfy this requirement and require the least amount of administrative effort? (Choose two.) 

A. Configure Authentication Services for Active Directory based authentication to the ESXi hosts 

B. Configure a unique root level account for each administrator using the vSphere Client 

C. Configure user accounts in a host profile, then apply the host profile to the ESXi hosts 

D. Configure Active Directory group ESX Admins with each administrator's AD account 

Answer: AD 


VCP-510 real exam

Renewal vcp-510 exam vce:

Q206. Virtual machine VM1 is unable to communicate with virtual machine VM2. Both virtual machines are connected to a portgroup named Production on vSwitch1 on host ESXi01. Which statement could explain why? 

A. The only vmnic connected to vSwitch1 on ESXi01 is set to unused 

B. The only vmnic connected to vSwitch1 on ESXi01 is set to standby 

C. Load balancing settings on Production do not match vSwitch1 

D. VM1 is configured for VGT, VM2 is configured for VST 

Answer: D 


Q207. A user wants to receive an email notification when the virtual machine CPU usage enters a warning state and again when the condition enters a alarm state. Which two state changes must be selected to receive the appropriate notifications? (Choose two.) 

A. Yellow-red state change 

B. Red-green state change 

C. Yellow-green state change 

D. Green-yellow state change 

Answer: AD 


Q208. A virtual machine failure occurs in a vSphere HA cluster, but the VM is not restarted. No error messages are given. Which two conditions would explain this behavior? (Choose two.) 

A. Monitoring sensitivity was set to Low. 

B. Application Monitoring Only was selected. 

C. The virtual machine has failed three times. 

D. The HA cluster was set up with all defaults. 

Answer: CD 


Q209. What two methods can be used to reduce the vMotion migration time of a virtual machine? (Choose two.) 

A. Enable High priority on the virtual machine before starting the Migrate wizard. 

B. Select High priority during the Migrate wizard. 

C. Lower the memory reservation for the virtual machine. 

D. Ensure the cluster has the default Swapfile policy set. 

Answer: BD 


Q210. A series of Auto Deploy ESXi 5.x hosts which utilize vSphere Standard Switches are unable to boot. In prior testing, all of the hosts were able to boot successfully. 

Which two conditions might cause this issue? (Choose two.) 

A. The Hosts are unable to connect to the SAN. 

B. The TFTP server is down. 

C. The DNS server is down. 

D. The DHCP server is down. 

Answer: BD