★ Pass on Your First TRY ★ 100% Money Back Guarantee ★ Realistic Practice Exam Questions

Free Instant Download NEW CLSSGB Exam Dumps (PDF & VCE):
Available on: https://www.certleader.com/CLSSGB-dumps.html


Want to know Examcollection CLSSGB Exam practice test features? Want to lear more about GAQM Certified Lean Six Sigma Green Belt (CLSSGB) certification experience? Study Accurate GAQM CLSSGB answers to Renewal CLSSGB questions at Examcollection. Gat a success with an absolute guarantee to pass GAQM CLSSGB (Certified Lean Six Sigma Green Belt (CLSSGB)) test on your first attempt.

Online GAQM CLSSGB free dumps demo Below:

NEW QUESTION 1
Lean Six Sigma’s general approach to solving significant challenges related to a process is called __________.

  • A. DOE
  • B. SIPOC
  • C. DMAIC
  • D. FMEA

Answer: C

NEW QUESTION 2
One of the metrics commonly used in Lean Six Sigma is DPU. This acronym stands for __________.

  • A. Deferred planned usage
  • B. Defects per unit
  • C. Decreased production utilization
  • D. Downtime per unit

Answer: B

NEW QUESTION 3
The ability to repeat the same measurement obtained with one measurement instrument used several times by one appraiser while measuring the identical characteristic on the same part is known as __________.

  • A. Repeatability
  • B. Bias
  • C. Linearity
  • D. Reproducibility

Answer: A

NEW QUESTION 4
Lean removes many forms of __________ so Six Sigma can focus on reducing __________.

  • A. Waste, variability
  • B. Inventory, defects
  • C. Waste, cost
  • D. Movement, variation

Answer: A

NEW QUESTION 5
A primary benefit of using a Multi-Vari Chart is it provides a visual presentation of two-way interactions.

  • A. True
  • B. False

Answer: A

NEW QUESTION 6
In order to standardize project savings financial calculation such project benefits can be compared the financial savings are typically calculated over what period of time?

  • A. 12 months
  • B. 24 months
  • C. The remainder of the calendar year
  • D. The remainder of the fiscal year

Answer: A

NEW QUESTION 7
Nominal Scale data consists of names, labels or categories and cannot be arranged in any mathematical ordering scheme. Complex arithmetic functions cannot be easily applied to Nominal Data:

  • A. True
  • B. False

Answer: A

NEW QUESTION 8
The Regression Model for an observed value of Y contains the term ?o which represents the Y axis intercept when X = 0.

  • A. True
  • B. False

Answer: A

NEW QUESTION 9
Which of these statements describe an undesirable situation when implementing SPC? (Note: There are 2 correct answers).

  • A. The lower Control Limit for the R chart is equal to zero
  • B. The Control Limits are wider than the customer specification limits
  • C. A process is in Statistical Control before implementation of SPC
  • D. Attempt to use SPC for tracking transaction times at a warehouse
  • E. Indication of the specification limits on the Control Chart

Answer: BE

NEW QUESTION 10
The essence of Lean is to concentrate effort on removing waste while improving process flow to achieve speed and agility at lower cost.

  • A. True
  • B. False

Answer: A

NEW QUESTION 11
After a Belt has put data through the smoothing process which chart would be used to look for trends in the data?

  • A. Moving Average Chart
  • B. Multi-Vari Chart
  • C. X bar Chart
  • D. Pareto Chart

Answer: A

NEW QUESTION 12
For the data shown here a Belt suspects the three grades are supplying the same results. Which statement(s) are true for proper Hypothesis Testing?

  • A. The most appropriate Central Tendency to test is the Means
  • B. An appropriate test to test Central Tendency is the Levene’s test
  • C. An appropriate test to test Central Tendency is the ANOVA test
  • D. An appropriate test to test Central Tendency is the Mood’s Median test

Answer: D

NEW QUESTION 13
The Regression Model for an observed value of Y contains the term ?o which represents the Y axis intercept when X = 0.

  • A. True
  • B. False

Answer: A

NEW QUESTION 14
When two Inputs have an impact on the Output together yet seem to have no or little impact on their own this is called a/an __________.

  • A. Interaction
  • B. Oddity
  • C. Coincidence
  • D. Impossibility

Answer: A

NEW QUESTION 15
Fractional Factorial designs for an experimental approach are used when __________ about the multiple metric interaction in a process.

  • A. Much is known
  • B. Little is known
  • C. We don’t care
  • D. Data exists

Answer: B

NEW QUESTION 16
......

P.S. Easily pass CLSSGB Exam with 200 Q&As DumpSolutions.com Dumps & pdf Version, Welcome to Download the Newest DumpSolutions.com CLSSGB Dumps: https://www.dumpsolutions.com/CLSSGB-dumps/ (200 New Questions)