Act now and download your Microsoft 70-499 test today! Do not waste time for the worthless Microsoft 70-499 tutorials. Download Most up-to-date Microsoft Recertification for MCSD: Application Lifecycle Management exam with real questions and answers and begin to learn Microsoft 70-499 with a classic professional.

2021 Jul 70-499 book

Q181. - (Topic 1) 

Your network environment includes a Microsoft Visual Studio Team Foundation Server 2012 (TFS) server. 

Version control is configured with one project collection and two team projects. Some users use 2010 and 2012 clients, such as Visual Studio and Team Explorer Everywhere. 

You need to ensure that users will be prompted by, and can satisfy, the comments check-in policy when using both 2010 and 2012 clients. 

Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.) 

A. Add the Changeset Comments policy in the team project collection’s source control settings. 

B. Add the Changeset Comments policy in the source control settings for each team project. 

C. Install the TFS 2010 Power Tools on all clients. 

D. Install the TFS 2012 Power Tools on all clients and configure the policy by using Team Explorer. 

E. Install the TFS 2010 and 2012 Power Tools on the TFS application tier and configure the policy by using Team Foundation Administrator. 

Answer: B,C 


Q182. - (Topic 1) 

Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) server. 

You are performing capacity planning for three teams of developers. Each team is developing a different software module. Developers belong to only one team. 

You need to ensure that team members can edit only the work items of the module on which they are working. 

What should you do? 

A. 

Create three teams under the Team Project for team members of three modules. 

On the Security tab of the team give Edit work items in this node permission to that team for the corresponding area. 

Deny that permission to other two teams. 

B. 

Create three TFS groups at the Team Project level for team members of three modules. 

Create three areas for the three modules. 

For each area, on the Permissions tab of the groups, give Edit work items in this node permission to the group corresponding to that area. 

Deny that permission to other two groups. 

C. 

Create one TFS group at the Team Project level for the team members of the three modules. 

Create three areas for the three modules. For each area, give Edit work items in this node permission to the group. 

D. 

Create three teams under the Team Project for team members of three modules. 

For each area corresponding to the team, give Edit work items in this node permission to that team. 

Deny that permission to other two teams. 

Answer: D 


Q183. - (Topic 2) 

You are using Microsoft Test Manager (MTM). 

You plan to redesign a group of test cases that have similar steps but test for different conditions. 

You need to make the test cases easy to maintain. 

What should you do? 

A. Create a shared steps work item from the Shared Steps Manager view for every test case in the group and replace the test steps in the appropriate test case. 

B. Convert the manual test cases to automated tests. 

C. Open a test case, create a shared steps work item from the recurring test steps, and reuse this shared steps work item for the other test cases in the group. 

D. Find recurring test steps in the test cases and use them to create new test cases. Replace the recurring test steps with a reference to the new test cases. 

Answer: C 


Q184. DRAG DROP - (Topic 2) 

You are using Microsoft Test Manager (MTM) to manage customer service bug reports. 

A customer has reported a problem and provided documentation of the steps to reproduce the problem. 

You need to use exploratory testing to create a bug and associate the bug to a new test case. 

What should you do? (To answer, move the five appropriate actions from the list of actions to the answer area and arrange them in the correct order.) 

Answer: 

153. - (Topic 2) 

You are using Microsoft Test Manager (MTM) to perform exploratory testing. 

You need to insert an image into the comment area for the test run. 

What are two possible ways to accomplish this goal? (Each correct answer presents a complete solution. Choose two.) 

A. Use the Add screenshot tool in the exploratory test runner and drag the selection box over the area of the screen you want to capture. 

B. Capture the image you want to insert by using your favorite screen capture utility and paste the image into the comment area of the exploratory testing window. 

C. Capture the image you want to insert by using your favorite screen capture utility and save the file to disk. Add the image as an attachment to the test run. 

D. Capture the image you want to insert by using your favorite screen capture utility. Drag and drop the file onto the comment area from the Windows Explorer. 

Answer: A,C 


Q185. - (Topic 1) 

Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. 

You lead a team of testers that is testing a specific module of an application. You want to list only the test cases that are assigned to you testers. 

You need to create a query on work items of the type Test Case. 

What are two possible ways to achieve this goal? (Each correct answer presents a complete solution. Choose two.) 

A. 

Create a team project level group for testers of your module. 

Create a work item query that uses the = operator on the Assigned To field and the group of testers. 

B. 

Create a team for testers of your module. 

Create a work item query that uses the = operator on the Assigned To field and the team of testers. 

C. 

Create a team project level group for testers of your module. 

Create a work item query that uses the IN GROUP operator on the Assigned To field and the group of testers. 

D. 

Create a team for testers of your module. 

Create a work item query that uses the IN GROUP operator on the Assigned To field and the team of testers. 

Answer: C,D 


70-499 actual exam

Down to date 70-499 exam engine:

Q186. - (Topic 3) 

Your development team uses Microsoft Visual Studio Team Foundation Server (TFS) 2012 with the Microsoft Framework (MSF) for Capability Maturity Model Integration (CMMI) template. 

You are reviewing outstanding issues with your team and trying to agree on whether you can mark a particular issue as resolved. 

You need to determine whether the issue has been resolved. 

Which two criteria must the team meet before the issue can be marked as resolved? (Each correct answer presents part of the solution. Choose two.) 

A. All impediments under an issue have been completed. 

B. All user stories under an issue have been completed. 

C. Stakeholders are satisfied that the issue has been resolved. 

D. All tasks under an issue have been completed. 

Answer: C,D 

Explanation: Review Issues for Resolution After all tasks under an issue have been completed, the stakeholders should decide whether the issue has been resolved. http://msdn.microsoft.com/en-us/library/ee461539.aspx 


Q187. - (Topic 3) 

Your development team uses Microsoft Visual Studio Team Foundation Server (TFS) 2012 to develop and support an enterprise-wide web application. 

The system is too large to perform a manual smoke test. 

You need to ensure that the latest release to production has not broken anything. 

Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.) 

A. Create a new build definition with your tests configured for the production URI(s). Run the tests and have TFS report success or failure. 

B. Create a new virtual machine in Microsoft Test Manager (MTM) that mirrors your production environment. Create a new build that runs your test projects and have TFS report success or failure. 

C. Create a series of CodedUI Tests in Microsoft Visual Studio. 

D. Create a complete set of unit test projects within Microsoft Visual Studio 2012. 

Answer: B,C 


Q188. - (Topic 3) 

You are an automation engineer for your company. Your Scrum team is defining processes 

for how your team should deliver products for product owner approval. 

Your development team is deciding what the definition of done should be. 

You need to contribute a test suite that will confirm each user story's level of done. 

Which test should you perform? 

A. Integration 

B. Security 

C. Performance 

D. System 

Answer: D 


Q189. DRAG DROP - (Topic 1) 

You have a Microsoft Visual Studio Team Foundation Server (TFS) 2010. A new server is installed with Windows Server 2012 R2 Standard. 

You want to migrate TFS to the new hardware and upgrade it to TFS 2013. You install TFS 2013 on the new hardware. 

You need to complete the migration and upgrade. 

Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order. 

Answer: 


Q190. - (Topic 2) 

You are using Microsoft Test Manager (MTM). You are using the Microsoft Visual Studio Scrum 1.0 process template. 

You are developing a test from an engineering document that has detailed verification information. 

You need to ensure that the document is directly accessible whenever a tester runs a specific step. 

What are two possible ways to accomplish this goal? (Each correct answer presents a complete solution. Choose two.) 

A. Add a test step attachment. 

B. Add a test case attachment. 

C. Add a tested backlog items link. 

D. Add a test case link. 

Answer: A,B