★ Pass on Your First TRY ★ 100% Money Back Guarantee ★ Realistic Practice Exam Questions

Free Instant Download NEW 200-125 Exam Dumps (PDF & VCE):
Available on: https://www.certleader.com/200-125-dumps.html


Proper study guides for Most recent Cisco CCNA Cisco Certified Network Associate CCNA (v3.0) certified begins with Cisco 200-125 preparation products which designed to deliver the Realistic 200-125 questions by making you pass the 200-125 test at your first time. Try the free 200-125 demo right now.

2021 Oct 200-125 question

Q191. - (Topic 9) 

Which command sequence can you enter to create VLAN 20 and assign it to an interface on a switch? 

A. Switch(config)#vlan 20 

Switch(config)#Interface gig x/y 

Switch(config-if)#switchport access vlan 20 

B. Switch(config)#Interface gig x/y 

Switch(config-if)#vlan 20 

Switch(config-vlan)#switchport access vlan 20 

C. Switch(config)#vlan 20 

Switch(config)#Interface vlan 20 

Switch(config-if)#switchport trunk native vlan 20 

D. Switch(config)#vlan 20 

Switch(config)#Interface vlan 20 

Switch(config-if)#switchport access vlan 20 

E. Switch(config)#vlan 20 

Switch(config)#Interface vlan 20 

Switch(config-if)#switchport trunk allowed vlan 20 

Answer: A 


Q192. CORRECT TEXT - (Topic 7) 


Answer: On the MGT Router: 

Config t 

Router eigrp 12 

Network 192.168.77.0 


Q193. - (Topic 2) 

A network administrator creates a layer 3 EtherChannel, bundling four interfaces into channel group 1. On what interface is the IP address configured? 

A. the port-channel 1 interface 

B. the highest number member interface 

C. all member interfaces 

D. the lowest number member interface 

Answer: A 


Q194. - (Topic 2) 

Refer to the exhibit. 


All switch ports are assigned to the correct VLANs, but none of the hosts connected to SwitchA can communicate with hosts in the same VLAN connected to SwitchB. Based on the output shown, what is the most likely problem? 

A. The access link needs to be configured in multiple VLANs. 

B. The link between the switches is configured in the wrong VLAN. 

C. The link between the switches needs to be configured as a trunk. 

D. VTP is not configured to carry VLAN information between the switches. 

E. Switch IP addresses must be configured in order for traffic to be forwarded between the switches. 

Answer: C 


Q195. - (Topic 5) 

Refer to the exhibit. 


What statement is true of the configuration for this network? 

A. The configuration that is shown provides inadequate outside address space for translation of the number of inside addresses that are supported. 

B. Because of the addressing on interface FastEthernet0/1, the Serial0/0 interface address will not support the NAT configuration as shown. 

C. The number 1 referred to in the ip nat inside source command references access-list number 1. 

D. ExternalRouter must be configured with static routes to networks 172.16.1.0/24 and 172.16.2.0/24. 

Answer: C 


200-125 free download

Renew 200-125 braindumps:

Q196. - (Topic 9) 

Which protocol is the Cisco proprietary implementation of FHRP? 

A. HSRP 

B. VRRP 

C. GLBP 

D. CARP 

Answer: A 


Q197. - (Topic 3) 

Which option is a valid IPv6 address? 

A. 2001:0000:130F::099a::12a 

B. 2002:7654:A1AD:61:81AF:CCC1 

C. FEC0:ABCD:WXYZ:0067::2A4 

D. 2004:1:25A4:886F::1 

Answer: D 


Q198. - (Topic 1) 

Which layer in the OSI reference model is responsible for determining the availability of the receiving program and checking to see if enough resources exist for that communication? 

A. transport 

B. network 

C. presentation 

D. session 

E. application 

Answer: E 


Q199. - (Topic 1) 

Where does routing occur within the DoD TCP/IP reference model? 

A. application 

B. internet 

C. network 

D. transport 

Answer: B 


Q200. - (Topic 9) 

Which command can you use to set the hostname on a switch? 

A. switch-mdf-c1(config)#hostname switch-mdf1 

B. switch-mdf-c1>hostname switch-mdf1 

C. switch-mdf-c1#hostname switch-mdf1 

D. switch-mdf-c1(config-if)#hostname switch-mdf1 

Answer: A